Hexagon Tower, Crumpsall Vale, Blackley, Manchester M9 8GQ
Project cost: £50,000
AP Mitchell Group were contracted by NG Bailey to undertake the installation of 2 No. plastic sectional cold water storage tanks at the Hexagon Tower building in Manchester.
Our works at this site involved the install of the 2 No. 40 cubic meter sectional water tanks, along with the supporting mains cold water and distribution pipework, a Calpeda MXV sump pump, and the required valves to allow full and safe operation of the tanks.
Pipework routing was a particular area of focus during the delivery of this project, as the cold water tanks required a minimum clearance space around them to allow for full operation.