Pavilion E, Holland Street, London, SE1 9NX
Project cost: £254,000
AP Mitchell Group conducted mechaanical and electrical engineering works within the new property development at NEO Banskide Pavilion E in London. Our work at this site included the isolating and removal of an existing chiller unit, which was replaced with new air handling unit and coils. The existing unit was integrated within the building's lighting and fire alarm system, so we also provided an upgrade to the lighting systems on the first and second floors of the building. This included installing new Thorlux open area illuminators, as well as new emergency lighting. AP Mitchell Group were also responsible for making modifications to the fire alarm system.